We’re proud to say that construction at the Grand Colorado on Peak 8 is on track! The warm weather and bluebird skies have been to our advantage allowing us to make continual progress on your dream resort!  Here are a few updates from the past month:

 Phase 1:

  • We have started the exterior sheathing on the 3rd floor
  • We have begun the roofing insulation
  • We have started installing the windows and sliding doors in the residential units
  • The interior metal framing is 90 percent complete in the residential units
  • The boilers have arrived
  • The main electrical panels are being installed
  • The installation of scaffolding is complete
  • The exterior metal framing is complete

 Phase 2:

  • We have started the concrete flatwork on the 1st floor
  • The structural steel is complete throughout the 1st floor

Deb Norton
Grand Colorado on Peak 8 Project Coordinator

 

Grand Colorado Progress Pictures:

1 reply
  1. Daniel Parker says:

    Very excited to see the progress. I have had many, MANY friends and family tell me o dump my time shares (I own at Peak 7 as well), but I tell them that BGV knows how to take care of their owners.

    I look forward to my first weak at Peak 8!

    Daniel

Comments are closed.