Grand Lodge on Peak 7 Property Information

Letter from the General Manager

Salutations from the Grand Lodge on Peak 7 family. With another ski season in the books, we are excited to look ahead to several improvement projects around the resort. We hope to see some warm weather ahead, while still maintaining the precipitation that will fuel our waterways and prepare us for a summer full of fun.

Grand news:

  • Congratulations to Bruce and Debbie Donato, who won a pair of Epic Local Ski Passes for the 2018–2019 ski season. Please visit the Concierge Desk for more information on raffle prizes.
  • Both the North and South Buildings have been furnished with new carpet on the ground levels.
  • The pool decks have received a refurbishment with fresh stain and caulk. Please check it out during your next trip to the property!
  • Phase Three replacements have commenced with dining room tables, chairs, and bar stools in the one-bedroom master units.
  • Phase Three, Four, and Five armchair replacements are well underway.

Please note that Ski Hill Road may experience one-way traffic and slight delays throughout the summer. Shuttle operations will continue as usual during this time.

Thank you for being a valued member of the Grand Lodge on Peak 7 family. We look forward to seeing you during your next mountain getaway.

Grand regards,

Joanni Linton
General Manager, the Grand Lodge on Peak 7

Upcoming Closures

  • Indoor Hot tub: Closed Saturday, April 21 – open Wednesday, April 25
  • Kids Pool: Closed Monday, April 23 – open Friday, April 27
  • Grotto:Closed Saturday, April 28 – open Wednesday, May 2
  • Soothe Spa: Closed Monday, April 30 and Tuesday, May 1
  • Outdoor Hot tub: Closed Tuesday, April 30 – open Friday, May 4
  • Plunge Pool: Closed Saturday, May 5 – open Friday, May 11
  • Lower Hot tub: Closed Saturday, May 12 –  open Friday, May 18
  • Indoor/Outdoor pool: Closed Saturday,May 19 – open Friday, May 25
  • Adult Hot tub: Closed Monday, May 21 – open Sunday, May 27
  • Construction on Ski Hill road is estimated to begin on April 23 until August 7, 2018. During this time portions of the road may become one lane causing small traffic delays.

Monday, June 4:  Heating Boilers Shut Down

  • Pools and hot tubs will remain open unless they fall below 70 degrees.
  • All units will have hot water for sinks, showers, tubs, washing machines, etc.
  • Units will not have floor or baseboard heat, but fireplaces will be fully functional.

Wednesday, June 6: Domestic Water Shut Down 

  • All units in the South Building will lose all hot water. This includes showers, tubs, sinks and washing machines.
  • All units will have cold water access for cooking, cleaning and drinking.
  • Units in the North Building will be available for showers and baths.